Customization: | Available |
---|---|
After-sales Service: | Online Technical Supporting |
Certification: | CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction
TECHNICAL PARAMETERS
Model Item |
Unit |
50 |
100 |
150 |
200 |
300 |
500 |
1000 |
Max. Evaporation Capacity |
kg |
50 |
100 |
150 |
200 |
300 |
500 |
1000 |
Overall Dimension |
mm |
1600× |
2000× |
2400× 13500 |
2800× |
3200× |
3800× |
4600× |
The Pressure of High-pressure |
Mpa |
2~10 |
||||||
Power |
KW |
8.5 |
14 |
22 |
24 |
30 |
82 |
30 |
Inlet Air |
oC |
140~350 |
||||||
Moisture Content of Finished Product |
% |
<5( can be reached to 0.5) |
||||||
Material Recovery Rate |
% |
>97 |
||||||
Electric Heater |
KW |
75 |
120 |
150 |
temperature is lower than 200, the |
|||
Electricity |
Mpa+ |
0.5+54 |
0.6+90 |
0.6+108 |
according to the practical condition |
|||
Hot Air Furnace |
Kcal/h |
100000 |
150000 |
200000 |
300000 |
400000 |
500000 |
1200000 |
Process conditions
Atomization method: centrifugal
Fog droplets and hot air contact method: parallel flow
Heat source and heating method: electric heating
Dust removal method: Two-stage cyclone + scrubber
Product collection method: Dehumidification cold wind collection
Installation and Commissioning and Training:
1. Buyers arrange installation and debugging by themselves under a manual book from the supplier.
2. If the buyer requires engineers from the seller's party, the buyer should arrange the following items:
(A)Within 30 days after the machines are delivered to the buyer's factory, the buyer shall inform the seller to arrange engineers to the buyer's factory for installation, commissioning, test, and training machine operators.
(B)The buyer should provide the engineers(1-2 person) the boarding and lodging, transportation during the engineer's stay in the buyer's country, and round trip air ticket and visa fee for the engineers. Besides, the buyer should pay the money as salary for one engineer per day.
Project
Company Information