Description
The Rapid Mixer granulator working principles are based on two decisive factors essential for the intimate mixing system.
- Biotech / Pharmaceutical: powder mixing and granulating before tableting.
- Food: seasoning mixing and granulating.
- Chemical: Chemical material mixing and granulating.
- Electronic metal powder mixing and granulating.
- Plastic powder mixing and granulating.
Technical Data
Model |
YDSZ-5 |
YDSZ-10 |
YDSZ-50 |
YDSZ-150 |
YDSZ-200 |
YDSZ-250 |
YDSZ-300 |
YDSZ-400 |
YDSZ-600 |
YDSZ-800 |
Service Capacity(L) |
5 |
10 |
50 |
150 |
200 |
250 |
300 |
400 |
600 |
800 |
Rational Speed of Stirring Paddle (rpm) |
300/600 |
300/600 |
200/400 |
180/270 |
180/270 |
180/270 |
140/220 |
106/155 |
80/120 |
66/100 |
Power of Stirring Paddle Motor(kW) |
1.5/2.2 |
1.5/2.2 |
4/5.5 |
6.5/8 |
9/11 |
9/11 |
13/16 |
18.5/22 |
22/30 |
32/42 |
Rational Speed of Cutter(r/min) |
1500/3000 |
Power of Cutter Motor (kW) |
0.85/1.1 |
0.85/1.1 |
1.3/1.8 |
2.4/3 |
4.5/5.5 |
4.5/5.5 |
4.5/5.5 |
6.5/8 |
9/11 |
9/11 |
Features
1. High uniformity, very different proportions also can uniformly mix.
2. Short mixing time, about 5 ~ 10 min/batch finished.
3. Good tightness, use an air bag to clamp the cover.
4. Multi-safety interlock device, high safety.
5. Optional equipment for a different product feature.
Details
The chopper detail pic.
Application
Installation and Commissioning and Training
1. Buyers arrange installation and debugging by themselves under a manual book from the supplier.
2. If the buyer requires engineers from the seller's party, the buyer should arrange the following items:
(A)Within 30 days after the machines are delivered to the buyer's factory, the buyer shall inform the seller to arrange for engineers to the buyer's factory for installation, commissioning, testing, and training of machine operators.
(B)The buyer should provide the engineers(1-2 person) the boarding and lodging, transportation during the engineer's stay in the buyer's country, and round trip air ticket and visa fee for the engineers. Besides, the buyer should pay the money as salary for one engineer per day.